Involve in IT vendor bidding process from the very beginning (original entrusted IT vendor discontinued as SOW added with OE team requirement)
data check and clean up including
car parc (total and by city level)
Repl industry projection
3rd party industry data (LMC, GfK and Syntun),
OE industry projection
IHS new car production and sales data
IHS EV production data
CAAM actualized new car sales and production data
GY OE fitment
repl pull projection model and sales opportunity calculation data/logic checking;
discuss and data checking for all data integration (RTM data integration hasn’t been included in yet);
communicate with IT/IT vendor On expected output design;
communicate with internal stakeholder and vendor On user authorization;
Routine work:
RvsCC 5-year industry analysis and volume projection (inch, car segment, country of origin, popular size view)
AOP industry projection and guidance for volume planning (quarterly/monthly phasing, Online/offline channel, mix)
Monthly industry projection for both repl and OE (actualization and future projection), MOR deck preparation, Demand meeting deck preparation
Car parc databa
Winter tire/AT/EV tire industry projection
Size scan for new product line planning
Monthly macro indicator scanning
Routine databa
Ad-hoc request:
By channel industry outlook analysis for RTM 10-year roll-out plan
GY and Cooper volume breakdown for 10-year plan (by car segment, by inch, by country of origin, by consumer segment)
Verify OE pull contribution to repl volume
Design OE pull projection model for Cooper team
EV market analysis for OE team to acquire EV projects
Car parc analysis On *** project for product team
Selective size car parc analysis for sales team
Car parc data for research project sample size design
Size coverage analysis for RTM roll-out process tracking
CopyRight©2024 YYOK.COM All Rights Reserved 汕头市九鼎科技有限公司 版权所有 ICP经营许可证编号:粤B2-20050302号
地址:广东省汕头市珠港新城龙光世纪商务中心10幢1103 EMAIL:ok@yyok.com